R#SiteSerial NumberMeasurementStart DateStart TimeEnd DateEnd TimeData Quality Statement
1BMSGlobal Diffuse SPN109/29/202309:39:0009/29/202313:48:00Due to an NREL-wide power outage caused by Xcel Energy, the following BMS instruments were down due to no power: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, All WISERs, CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16.
2BMSGlobal Diffuse SPN108/06/202307:12:0008/06/202312:06:00Due to an electrical systems failure at NREL, the following BMS instruments were down due to no power: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, All WISERs, CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16.
3BMSGlobal Diffuse SPN111/17/202007:21:0011/17/202007:45:00Due to a scheduled NREL/SRRL power outage, to replace a surge protection device on the SRRL building, the following BMS instruments were down: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, WISERs (Horiz;2-Axis;1-Axis), CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16.
4BMSGlobal Diffuse SPN105/18/202013:03:0012/15/202119:31:00DATA CORRECTED on 12/17/2021: Irradiances were increased by 0.675% due to revised BORCAL report for all BMS shortwave radiometers calibrated in 2020 and 2021.
5BMSGlobal Diffuse SPN103/09/201908:40:0003/09/201912:59:00Due to a scheduled NREL/SRRL power outage, to install power meters on the SRRL building, the following BMS instruments were down: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, WISERs, CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16.
6BMSGlobal Diffuse SPN104/25/201507:20:0004/25/201509:39:00Due to a scheduled NREL/SRRL power outage, to remove wiring from the building ATS, the following BMS instruments were down: TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100, MS-7XX, LI-1800.
7BMSGlobal Diffuse SPN112/28/201306:46:0012/28/201315:59:00Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
8BMSGlobal Diffuse SPN112/21/201307:00:0012/21/201316:22:00Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
9BMSGlobal Diffuse SPN103/02/201308:06:0003/02/201318:24:00Due to a scheduled NREL power outage, to upgrade campus power capacity, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
10BMSGlobal Diffuse SPN105/26/201206:15:0005/26/201207:12:00Due to a planned power outage for SRRL electrical work, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC.
11BMSGlobal Diffuse SPN111/12/201111:59:0011/12/201113:26:00Due to an undervoltage followed by a power outage at 13:12, the following BMS instruments may be reading bogus or invalid data: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TWC.
12BMSGlobal Diffuse SPN109/08/201105:56:0009/08/201109:19:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC.
13BMSA360Diffuse SPN107/17/201117:30:0007/20/201108:00:00The Diffuse SPN1 signal is very noisy and unusable during this time, due a loose screw on the data logger multiplexer. The screw was tightened.
14BMSGlobal Diffuse SPN106/14/201113:01:0006/14/201113:14:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
15BMSGlobal Diffuse SPN105/25/201105:19:0005/26/201112:16:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
16BMSGlobal Diffuse SPN105/17/201114:20:0005/17/201114:48:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
17BMSGlobal Diffuse SPN105/07/201105:18:0005/07/201111:45:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
18BMSGlobal Diffuse SPN104/15/201106:11:0004/15/201106:50:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
19BMSGlobal Diffuse SPN112/23/201008:54:0012/23/201011:15:00Instrument was being moved to a booster seat to raise it to the height of surrounding instruments on table. Data during this time for both global and diffuse are bogus.
20BMSGlobal Diffuse SPN112/09/200910:52:0012/09/200914:22:00Due to a power outage (and bad power) at NREL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS-210W, SPN1, Snow Depth, TSI-880, POM-01.
21BMSGlobal Diffuse SPN111/15/200807:45:0011/15/200814:29:00Due to a planned power outage at SRRL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, SkyCam.