1 | BMS | | Global 501A-UVA | 11/17/2020 | 07:21:00 | 11/17/2020 | 07:45:00 | Due to a scheduled NREL/SRRL power outage, to replace a surge protection device on the SRRL building, the following BMS instruments were down: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, WISERs (Horiz;2-Axis;1-Axis), CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16. |
2 | BMS | | Global 501A-UVA | 03/09/2019 | 08:40:00 | 03/09/2019 | 12:59:00 | Due to a scheduled NREL/SRRL power outage, to install power meters on the SRRL building, the following BMS instruments were down: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, WISERs, CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16. |