R#SiteSerial NumberMeasurementStart DateStart TimeEnd DateEnd TimeData Quality Statement
1BMS25792E6Direct NIP (unit 2)04/02/201411:30:0004/10/201409:20:00The signal cable for the NIP was damaged. Irradiance is bogus during this time. Cable was repaired on 4/10/2014 at approx 9:20 MST.
2BMSDirect NIP (unit 2)12/28/201311:55:0012/28/201315:59:00Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, The following BMS instruments were not pointing at the sun during this time: Direct CH1, NIP #2, CUVA2, CUVB2, TUVR; and the following instruments were un-shaded: Diffuse 8-48, PSP, PIR. The South Sci-Tec tracker for these instruments are protected by UPS, however the battery depleted at 11:55 MST (the power outage started at 6:46 MST)
3BMSDirect NIP (unit 2)12/21/201310:30:0012/21/201316:22:00Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, The following BMS instruments were not pointing at the sun during this time: Direct CH1, NIP #2, CUVA2, CUVB2, TUVR; and the following instruments were un-shaded: Diffuse 8-48, PSP, PIR. The South Sci-Tec tracker for these instruments are protected by UPS, however the battery depleted at 10:30 MST (the power outage started at 7:00 MST)
4BMSDirect NIP (unit 2)03/02/201313:06:0003/02/201318:24:00Due to a scheduled NREL power outage, to upgrade campus power capacity, The following BMS instruments were not pointing at the sun during this time: Direct CH1, NIP #2, NIP #1, LI-201, NIP RG780, CUVA2, CUVB2, TWC; and the following instruments were un-shaded: Diffuse 8-48, PSP, CM22, CUV4, PIR, CG4. The Sci-Tec tracker for these insruments are protected by UPS, however the battery depleted at 13:06 MST (the power outage started at 8:06 MST)
5BMSDirect NIP (unit 2)05/07/201105:55:0005/09/201107:58:00There was a planned power outage for SRRL construction activities that started at 5:18 MST. Unfortunately, the backup generator provided to SRRL was providing bad power to the UPS powering the Sci-Tec trackers, therefore the UPS failed at 5:55 MST. Unfortunately, when normal AC power was restored at 11:45 MST, the Sci-Tec trackers had lost all their configuration due to UPS cycling on and off during the outage, therefore were not tracking. The tracker settings were restored on May 9 at 7:58 MST. The following BMS instruments were not pointing at the sun during this time: Direct CH1, NIP #2, NIP #1, LI-201, NIP RG780, CUVA2, CUVB2, TWC; and the following instruments were un-shaded: Diffuse 8-48, PSP, CM22, CUV4, PIR, CG4
6BMSDirect NIP (unit 2)04/15/201106:43:0004/15/201106:50:00There was a planned power outage for SRRL construction activities that started at 6:11 MST. Unfortunately, the UPS powering the Sci-Tec trackers failed due to bad/old batteries at 6:43 MST. The following BMS instruments were not point at the sun for this brief period of time: CH1, NIP #2, NIP #1, LI-201, NIP RG780.
7BMSDirect NIP (unit 2)05/27/201018:00:0005/28/201012:15:00Due to improper mounting of the replacement CH1 s/n 080033 the Sci-tec tracker was not tracking properly due to collision with the CH1 against tracker. The following BMS instruments were not pointing at the sun: Direct CH1, NIP2, CUVA2, & CUVB2 and the following instruments were unshaded: 8-48, PSP, PIR.
8BMSDirect NIP (unit 2)12/09/200912:11:0012/09/200914:22:00Due to a power outage at NREL, followed by bad power, the SRRL tracker UPS shutdown. The following BMS instruments were not pointing at the sun: Direct CH1, NIP1, NIP2, NIP-RG780, LI201, TWC500, CUV4; and the following instruments were unshaded: 8-48, CM22, PSP, CUV4, PIR, CG4.
9BMS25792E6Direct NIP (unit 2)08/04/200908:15:0008/07/200911:53:00The signal cable for the NIP was damaged. Irradiance is bogus during this time. Cable was replaced on 8/7/2009.
10BMSDirect NIP (unit 2)11/15/200814:02:0011/15/200814:32:00Due to a planned power outage at SRRL, the following BMS instruments were not pointing at the sun: Direct CH1, NIP1, NIP2, LI201, TWC500, CUV4.
11BMS25792E6Direct NIP (unit 2)05/25/200610:50:0005/25/200611:10:00Sci-Tec tracker #1 tracker was down due to power shutdown for installation of new SRRL equipment lift. The following instruments were NOT pointing at the SUN: NIP #2, CH1, TUVR.
12BMS25792E6Direct NIP (unit 2)07/23/200510:16:0007/23/200517:22:00Sci-Tec tracker #1 was down due to a scheduled NREL power outage on 7/23/2005 at 5:33 MST. The following instruments were NOT pointing at the SUN: NIP #2 and CH1.
13BMS25792E6Direct NIP (unit 2)07/10/200509:30:0007/10/200523:59:00The SRRL BMS Sci-Tec Tracker #1 was hung up on cables during this time. The NIP was not pointing at the SUN.
14BMS25792E6Direct NIP (unit 2)06/06/200515:00:0006/07/200511:45:00A BORCAL instrument was mistakenly connected in parrallel with the NIP. Direct irradiance profile was distorted during this time.