| 1 | BMS | | Direct CUVA2 | 05/03/2021 | 00:00:00 | 08/19/2021 | 08:30:00 | Direct UVA signal (and temperature control signal) can be bogus during this time, due to possible water contamination inside hardwired instrument cable. The CUVA2 and CUVB2 were removed from service and sent to the factory for repair on June 9, 2021. They were returned to service on August 19, 2021, the factory had installed new removable cables. |
| 2 | BMS | | Direct CUVA2 | 11/17/2020 | 07:21:00 | 11/17/2020 | 07:45:00 | Due to a scheduled NREL/SRRL power outage, to replace a surge protection device on the SRRL building, the following BMS instruments were down: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, WISERs (Horiz;2-Axis;1-Axis), CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16. |
| 3 | BMS | | Direct CUVA2 | 03/09/2019 | 08:40:00 | 03/09/2019 | 12:59:00 | Due to a scheduled NREL/SRRL power outage, to install power meters on the SRRL building, the following BMS instruments were down: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, WISERs, CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16. |
| 4 | BMS | | Direct CUVA2 | 05/11/2018 | 23:56:00 | 05/14/2018 | 07:05:00 | A GFCI on the North tracker post was tripped during rain shower. Data from the following instruments are bogus due to not having power during this time: CUVA2, CUVB2, TWC. |
| 5 | BMS | | Direct CUVA2 | 04/25/2015 | 07:20:00 | 04/25/2015 | 09:39:00 | Due to a scheduled NREL/SRRL power outage, to remove wiring from the building ATS, the following BMS instruments were down: TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100, MS-7XX, LI-1800. |
| 6 | BMS | | Direct CUVA2 | 05/30/2014 | 16:18:00 | 05/31/2014 | 11:30:00 | A GFCI on the North tracker post was tripped due to water logged ventilators (caused by rain showers). Data from the following instruments are bogus due to not having power during this time: CUVA2, CUVB2, TWC, PGS-100, POM-01. |
| 7 | BMS | | Direct CUVA2 | 12/28/2013 | 11:55:00 | 12/28/2013 | 15:59:00 | Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, The following BMS instruments were not pointing at the sun during this time: Direct CH1, NIP #2, CUVA2, CUVB2, TUVR; and the following instruments were un-shaded: Diffuse 8-48, PSP, PIR. The South Sci-Tec tracker for these instruments are protected by UPS, however the battery depleted at 11:55 MST (the power outage started at 6:46 MST) |
| 8 | BMS | | Direct CUVA2 | 12/28/2013 | 06:46:00 | 12/28/2013 | 15:59:00 | Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100. |
| 9 | BMS | | Direct CUVA2 | 12/21/2013 | 10:30:00 | 12/21/2013 | 16:22:00 | Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, The following BMS instruments were not pointing at the sun during this time: Direct CH1, NIP #2, CUVA2, CUVB2, TUVR; and the following instruments were un-shaded: Diffuse 8-48, PSP, PIR. The South Sci-Tec tracker for these instruments are protected by UPS, however the battery depleted at 10:30 MST (the power outage started at 7:00 MST) |
| 10 | BMS | | Direct CUVA2 | 12/21/2013 | 07:00:00 | 12/21/2013 | 16:22:00 | Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100. |
| 11 | BMS | | Direct CUVA2 | 09/13/2013 | 16:08:00 | 09/14/2013 | 09:55:00 | A GFCI on the North tracker post was tripped due to water logged ventilators (caused by rain showers). Data from the following instruments are bogus due to not having power during this time: CUVA2, CUVB2, TWC, PGS-100, POM-01. |
| 12 | BMS | | Direct CUVA2 | 07/13/2013 | 16:23:00 | 07/14/2013 | 08:29:00 | A GFCI on the North tracker post was tripped due to water logged ventilators (caused by rain showers). Data from the following instruments are bogus due to not having power during this time: CUVA2, CUVB2, TWC, PGS-100, POM-01. |
| 13 | BMS | | Direct CUVA2 | 05/01/2013 | 13:27:00 | 05/02/2013 | 06:40:00 | A GFCI on the North tracker post was tripped due to thunderstorms. Data from the following instruments are bogus due to not having power during this time: CUVA2, CUVB2, TWC, PGS-100, POM-01. |
| 14 | BMS | | Direct CUVA2 | 03/02/2013 | 13:06:00 | 03/02/2013 | 18:24:00 | Due to a scheduled NREL power outage, to upgrade campus power capacity, The following BMS instruments were not pointing at the sun during this time: Direct CH1, NIP #2, NIP #1, LI-201, NIP RG780, CUVA2, CUVB2, TWC; and the following instruments were un-shaded: Diffuse 8-48, PSP, CM22, CUV4, PIR, CG4. The Sci-Tec tracker for these insruments are protected by UPS, however the battery depleted at 13:06 MST (the power outage started at 8:06 MST) |
| 15 | BMS | | Direct CUVA2 | 03/02/2013 | 08:06:00 | 03/02/2013 | 18:24:00 | Due to a scheduled NREL power outage, to upgrade campus power capacity, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100. |
| 16 | BMS | | Direct CUVA2 | 07/06/2012 | 19:35:00 | 07/09/2012 | 10:18:00 | A GFCI on the North tracker post was tripped due to thunderstorms. Data from the following instruments are bogus due to not having power during this time: CUVA2, CUVB2, TWC, PGS-100, POM-01. |
| 17 | BMS | | Direct CUVA2 | 05/26/2012 | 06:15:00 | 05/26/2012 | 07:12:00 | Due to a planned power outage for SRRL electrical work, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC. |
| 18 | BMS | | Direct CUVA2 | 11/12/2011 | 11:59:00 | 11/12/2011 | 13:26:00 | Due to an undervoltage followed by a power outage at 13:12, the following BMS instruments may be reading bogus or invalid data: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TWC. |
| 19 | BMS | | Direct CUVA2 | 09/08/2011 | 05:56:00 | 09/08/2011 | 09:19:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC. |
| 20 | BMS | | Direct CUVA2 | 07/12/2011 | 22:57:00 | 07/13/2011 | 07:40:00 | Due to a tripped GFCI outlet at SRRL the following instruments were without power during this time: TWC & POM-01 Photometers, Direct CUVA2 & CUVB2, and the PGS100. The readings are either zero or bogus and should not be used. GFCI was tripped due to Eppley venitlators which were water logged by thunderstorm. |
| 21 | BMS | | Direct CUVA2 | 06/14/2011 | 13:01:00 | 06/14/2011 | 13:14:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
| 22 | BMS | | Direct CUVA2 | 05/25/2011 | 05:19:00 | 05/26/2011 | 12:16:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
| 23 | BMS | | Direct CUVA2 | 05/17/2011 | 14:20:00 | 05/17/2011 | 14:48:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
| 24 | BMS | | Direct CUVA2 | 05/07/2011 | 05:55:00 | 05/09/2011 | 07:58:00 | There was a planned power outage for SRRL construction activities that started at 5:18 MST. Unfortunately, the backup generator provided to SRRL was providing bad power to the UPS powering the Sci-Tec trackers, therefore the UPS failed at 5:55 MST. Unfortunately, when normal AC power was restored at 11:45 MST, the Sci-Tec trackers had lost all their configuration due to UPS cycling on and off during the outage, therefore were not tracking. The tracker settings were restored on May 9 at 7:58 MST. The following BMS instruments were not pointing at the sun during this time: Direct CH1, NIP #2, NIP #1, LI-201, NIP RG780, CUVA2, CUVB2, TWC; and the following instruments were un-shaded: Diffuse 8-48, PSP, CM22, CUV4, PIR, CG4 |
| 25 | BMS | | Direct CUVA2 | 05/07/2011 | 05:18:00 | 05/07/2011 | 11:45:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |