1BMSCloud Cover09/29/202309:39:0009/29/202313:48:00Due to an NREL-wide power outage caused by Xcel Energy, the following BMS instruments were down due to no power: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, All WISERs, CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16.
2BMSCloud Cover08/06/202307:12:0008/06/202312:06:00Due to an electrical systems failure at NREL, the following BMS instruments were down due to no power: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, All WISERs, CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16.
3BMSCloud Cover11/17/202007:21:0011/17/202007:45:00Due to a scheduled NREL/SRRL power outage, to replace a surge protection device on the SRRL building, the following BMS instruments were down: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, WISERs (Horiz;2-Axis;1-Axis), CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16.
4BMSCloud Cover03/09/201908:40:0003/09/201912:59:00Due to a scheduled NREL/SRRL power outage, to install power meters on the SRRL building, the following BMS instruments were down: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, WISERs, CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16.
5BMSCloud Cover04/25/201509:40:00The shadowband failed, due to power outage. Cloud cover estimate will be off.
6BMSCloud Cover04/25/201507:20:0004/25/201509:39:00Due to a scheduled NREL/SRRL power outage, to remove wiring from the building ATS, the following BMS instruments were down: TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100, MS-7XX, LI-1800.
7BMSCloud Cover06/04/201400:00:0007/14/201411:30:00The motor for the shadowband failed, therefore the shadowband is not moving. Cloud cover estimate will be off. The gearbox/motor assembly was replaced using part Dayton 2L003 on 7/14/2014.
8BMSCloud Cover12/28/201306:46:0012/28/201315:59:00Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
9BMSCloud Cover12/21/201307:00:0012/21/201316:22:00Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
10BMSCloud Cover03/02/201308:06:0003/02/201318:24:00Due to a scheduled NREL power outage, to upgrade campus power capacity, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
11BMS119Cloud Cover06/22/201201:31:0007/12/201211:12:00There was a power glitch at NREL at 1:31 MST on June 22, as a result the SRRL TSI-880 total sky imager power supply is dead. Power supply (model GPFC160-15G) was replaced on July 12.
12BMSCloud Cover11/12/201111:59:0011/14/201108:58:00Due to an undervoltage followed by a power outage at 13:12 the TSI-880 was not working, even when the power was restored at 13:26 on 11/12/2011. The TSI internal computer was rebooted at 8:58 on 11/14/2011.
13BMSCloud Cover06/14/201113:01:0006/14/201113:14:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
14BMSCloud Cover05/25/201105:19:0005/26/201112:16:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
15BMSCloud Cover05/17/201114:20:0005/17/201114:48:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
16BMSCloud Cover05/07/201105:18:0005/07/201111:45:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
17BMSCloud Cover04/15/201106:11:0004/15/201106:50:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
18BMSCloud Cover12/09/200910:52:0012/09/200914:22:00Due to a power outage (and bad power) at NREL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS-210W, SPN1, Snow Depth, TSI-880, POM-01.
19BMSCloud Cover11/15/200807:45:0011/15/200814:29:00Due to a planned power outage at SRRL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, SkyCam.
20BMS119Cloud Cover12/22/200708:41:0012/22/200711:26:00Due to a scheduled SRRL/Mesa Top power outage on 12/22/2007, the TSI-880 was not running, therefore cloud cover is unavailable during this time.
21BMS119Cloud Cover04/10/200612:59:0004/10/200615:26:00The ethernet connection for the TSI-880 was disconnected on April 10 @ 12:59 MST, so that ethernet could be re-routed due to installation of new equipment lift on deck. Instrument was left running, however data was lost during this time frame due to lack of memory in TSI-880. Ethernet was reconnected at 14:50 MST on April 11.
22BMS119Cloud Cover07/23/200505:33:0007/23/200517:22:00Due to a scheduled NREL power outage on 7/23/2005 at 5:33 MST, the TSI-880 was not running, therefore cloud cover is unavailable during this time.
23BMS119Cloud Cover12/02/200408:41:0005/03/200510:09:00The TSI-880 will be down for an extended period of time due to the Astrodyne power supply failing again (second time, first time occured during benchtesting of unit) due to a power dip at SRRL on 12/1/2004. The unit was returned to the factory. It required a new power supply with a higher current rating, that would be capable of charging the internal batteries. However, due to damage during shipment back to NREL, neary every component had to be replaced.