MIDC/Data Quality Statements
Total Records: 26, displaying 1-25
[Next Records]
R#SiteSerial NumberMeasurementStart DateStart TimeEnd DateEnd TimeData Quality Statement
1BMSGlobal CUVA104/25/201507:20:0004/25/201509:39:00Due to a scheduled NREL/SRRL power outage, to remove wiring from the building ATS, the following BMS instruments were down: TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100, MS-7XX, LI-1800.
2BMSGlobal CUVA105/21/201419:02:0005/22/201407:08:00A GFCI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W. GFCI trip is caused by water logged Eppley PSP ventilator.
3BMSGlobal CUVA112/28/201306:46:0012/28/201315:59:00Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
4BMSGlobal CUVA112/21/201307:00:0012/21/201316:22:00Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
5BMSGlobal CUVA109/13/201316:08:0009/14/201309:55:00A GFCI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W. GFCI trip is caused by water logged Eppley PSP ventilator.
6BMSGlobal CUVA107/13/201316:23:0007/14/201308:29:00A GFCI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W. GFCI trip is caused by water logged Eppley PSP ventilator.
7BMSGlobal CUVA103/02/201308:06:0003/02/201318:24:00Due to a scheduled NREL power outage, to upgrade campus power capacity, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
8BMSGlobal CUVA107/31/201212:28:0008/01/201206:18:00A GFCI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W. GFCI trip is caused by water logged Eppley PSP ventilator.
9BMSGlobal CUVA107/06/201219:35:0007/09/201210:18:00A GFCI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W.
10BMSGlobal CUVA105/26/201206:15:0005/26/201207:12:00Due to a planned power outage for SRRL electrical work, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC.
11BMSGlobal CUVA111/12/201111:59:0011/12/201113:26:00Due to an undervoltage followed by a power outage at 13:12, the following BMS instruments may be reading bogus or invalid data: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TWC.
12BMSGlobal CUVA109/08/201105:56:0009/08/201109:19:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC.
13BMSGlobal CUVA107/07/201116:45:0007/08/201112:46:00A GFI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W.
14BMSGlobal CUVA106/20/201100:10:0006/21/201105:09:00A GFI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W.
15BMSGlobal CUVA106/14/201113:01:0006/14/201113:14:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
16BMSGlobal CUVA105/25/201105:19:0005/26/201112:16:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
17BMSGlobal CUVA105/17/201114:20:0005/17/201114:48:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
18BMSGlobal CUVA105/07/201105:18:0005/07/201111:45:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
19BMSGlobal CUVA104/15/201106:11:0004/15/201106:50:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
20BMSGlobal CUVA107/04/201018:10:0007/06/201007:30:00Due to several tripped GFCI outlets at SRRL the following instruments were without power from July 4 @ 18:10 to July 6 @ 7:30 MST: Global CUVA1, CUVB1, MS210W, 501A and Direct CUVA2, CUVB2, PGS100. The readings are either zero or bogus and should not be used.
21BMSGlobal CUVA112/09/200910:52:0012/09/200914:22:00Due to a power outage (and bad power) at NREL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, POM-01.
22BMSGlobal CUVA111/15/200807:45:0011/15/200814:29:00Due to a planned power outage at SRRL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, SkyCam.
23BMSGlobal CUVA112/22/200708:41:0012/22/200711:24:00Due to a scheduled SRRL/Mesa Top power outage on 12/22/2007, the TSP-1, TSP-700, All Global UVA and UVB, and the TWC Photometer were without power, therefore data is either bad or bogus.
24BMS950006Global CUVA105/25/200610:50:0005/25/200611:10:00Due to power shutdown for installation of new SRRL equipment lift, the following Global UV instruments were down: CUVA1, CUVB1, MS-210W, 501A, UVB-1, UV-S-A-T, UV-S-B-T. Data during this time is bogus or bad.
25BMS950006Global CUVA107/23/200505:33:0007/23/200517:22:00Due to a scheduled NREL power outage on 7/23/2005 at 5:33 MST, the following Global instruments were down: CUVA1, CUVB1, MS-210W, 501A, UVB-1, UV-S-A-T, UV-S-B-T, TSP-1. Data during this time is bogus.