R# | Site | Serial Number | Measurement | Start Date | Start Time | End Date | End Time | Data Quality Statement |
1 | BMS | | Global TSP-700 | 09/29/2023 | 09:39:00 | 09/29/2023 | 13:48:00 | Due to an NREL-wide power outage caused by Xcel Energy, the following BMS instruments were down due to no power: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, All WISERs, CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16. |
2 | BMS | | Global TSP-700 | 08/06/2023 | 07:12:00 | 08/06/2023 | 12:06:00 | Due to an electrical systems failure at NREL, the following BMS instruments were down due to no power: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, All WISERs, CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16. |
3 | BMS | | Global TSP-700 | 11/17/2020 | 07:21:00 | 11/17/2020 | 07:45:00 | Due to a scheduled NREL/SRRL power outage, to replace a surge protection device on the SRRL building, the following BMS instruments were down: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, WISERs (Horiz;2-Axis;1-Axis), CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16. |
4 | BMS | | Global TSP-700 | 05/18/2020 | 13:03:00 | 12/15/2021 | 19:31:00 | DATA CORRECTED on 12/17/2021: Irradiances were increased by 0.675% due to revised BORCAL report for all BMS shortwave radiometers calibrated in 2020 and 2021. |
5 | BMS | | Global TSP-700 | 03/09/2019 | 08:40:00 | 03/09/2019 | 12:59:00 | Due to a scheduled NREL/SRRL power outage, to install power meters on the SRRL building, the following BMS instruments were down: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, WISERs, CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16. |
6 | BMS | | Global TSP-700 | 04/01/2018 | 00:00:00 | 04/14/2018 | 23:59:00 | The TSP-700 was reading low (up to about 100 W/m^2 at noon), problem was unknown and went away on its own. |
7 | BMS | | Global TSP-700 | 04/25/2015 | 07:20:00 | 04/25/2015 | 09:39:00 | Due to a scheduled NREL/SRRL power outage, to remove wiring from the building ATS, the following BMS instruments were down: TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100, MS-7XX, LI-1800. |
8 | BMS | | Global TSP-700 | 05/29/2014 | 00:00:00 | 06/09/2014 | 11:57:00 | The TSP-700 was reading low. Four screws behind the patch panel for this signal were retightened which fixed the problem. |
9 | BMS | | Global TSP-700 | 12/28/2013 | 06:46:00 | 12/28/2013 | 15:59:00 | Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100. |
10 | BMS | | Global TSP-700 | 12/21/2013 | 07:00:00 | 12/21/2013 | 16:22:00 | Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100. |
11 | BMS | | Global TSP-700 | 03/02/2013 | 08:06:00 | 03/02/2013 | 18:24:00 | Due to a scheduled NREL power outage, to upgrade campus power capacity, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100. |
12 | BMS | | Global TSP-700 | 05/26/2012 | 06:15:00 | 05/26/2012 | 07:12:00 | Due to a planned power outage for SRRL electrical work, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC. |
13 | BMS | | Global TSP-700 | 11/12/2011 | 11:59:00 | 11/12/2011 | 13:26:00 | Due to an undervoltage followed by a power outage at 13:12, the following BMS instruments may be reading bogus or invalid data: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TWC. |
14 | BMS | | Global TSP-700 | 09/08/2011 | 05:56:00 | 09/08/2011 | 09:19:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC. |
15 | BMS | | Global TSP-700 | 06/14/2011 | 13:01:00 | 06/14/2011 | 13:14:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
16 | BMS | | Global TSP-700 | 05/25/2011 | 05:19:00 | 05/26/2011 | 12:16:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
17 | BMS | | Global TSP-700 | 05/17/2011 | 14:20:00 | 05/17/2011 | 14:48:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
18 | BMS | | Global TSP-700 | 05/07/2011 | 05:18:00 | 05/07/2011 | 11:45:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
19 | BMS | 0212-2 | Global TSP-700 | 04/17/2011 | 12:00:00 | | | There is an occasional drastic noise or signal drop out problem with the SRRL BMS TSP-700 during this time. The instrument connections will be re-seated the next time a problem occurs. |
20 | BMS | | Global TSP-700 | 04/15/2011 | 06:11:00 | 04/15/2011 | 06:50:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
21 | BMS | 0212-2 | Global TSP-700 | 10/04/2010 | 13:00:00 | 10/06/2010 | 08:00:00 | There is an occasional drastic noise or signal drop out problem with the SRRL BMS TSP-700 during this time. The connector at the J-box was re-seated. |
22 | BMS | 0212-2 | Global TSP-700 | 09/22/2010 | 12:00:00 | 10/04/2010 | 08:00:00 | There is an occasional drastic noise or signal drop out problem with the SRRL BMS TSP-700 during this time. All screws in TSP-700 power supply box were retightened. |
23 | BMS | 0212-2 | Global TSP-700 | 08/11/2010 | 00:00:00 | 08/29/2010 | 19:00:00 | There is an occasional drastic noise or signal drop out problem with the SRRL BMS TSP-700 during this time. Problem appears to have stopped on 8/29/2010. |
24 | BMS | 0212-2 | Global TSP-700 | 12/13/2009 | 00:00:00 | 12/17/2009 | 15:30:00 | There is an occasional drastic noise or signal drop out problem with the SRRL BMS TSP-700 during this time. Some days there is no problem. (4) screws in the patch panel for this channel were retightened which seemed to fix the problem. |
25 | BMS | 0212-2 | Global TSP-700 | 12/09/2009 | 10:52:00 | 12/09/2009 | 14:22:00 | Due to a power outage (and bad power) at NREL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, POM-01. |