1BMSGlobal 501A09/29/202309:39:0009/29/202313:48:00Due to an NREL-wide power outage caused by Xcel Energy, the following BMS instruments were down due to no power: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, All WISERs, CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16.
2BMSGlobal 501A08/06/202307:12:0008/06/202312:06:00Due to an electrical systems failure at NREL, the following BMS instruments were down due to no power: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, All WISERs, CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16.
3BMSGlobal 501A11/17/202007:21:0011/17/202007:45:00Due to a scheduled NREL/SRRL power outage, to replace a surge protection device on the SRRL building, the following BMS instruments were down: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, WISERs (Horiz;2-Axis;1-Axis), CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16.
4BMSGlobal 501A03/09/201908:40:0003/09/201912:59:00Due to a scheduled NREL/SRRL power outage, to install power meters on the SRRL building, the following BMS instruments were down: 501A-UVA, TSP-700, UVSAT, UVSBT, SolarSIM-D2, CUVA2, WISERs, CUVB2, UVB-1, 501A-UVB, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, ASI-16.
5BMSGlobal 501A04/25/201507:20:0004/25/201509:39:00Due to a scheduled NREL/SRRL power outage, to remove wiring from the building ATS, the following BMS instruments were down: TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100, MS-7XX, LI-1800.
6BMSGlobal 501A05/21/201419:02:0005/22/201407:08:00A GFCI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W. GFCI trip is caused by water logged Eppley PSP ventilator.
7BMSGlobal 501A12/28/201306:46:0012/28/201315:59:00Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
8BMSGlobal 501A12/21/201307:00:0012/21/201316:22:00Due to a scheduled NREL power outage, to upgrade campus electrical infrastructure, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
9BMSGlobal 501A09/13/201316:08:0009/14/201309:55:00A GFCI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W. GFCI trip is caused by water logged Eppley PSP ventilator.
10BMSGlobal 501A07/13/201316:23:0007/14/201308:29:00A GFCI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W. GFCI trip is caused by water logged Eppley PSP ventilator.
11BMSGlobal 501A03/02/201308:06:0003/02/201318:24:00Due to a scheduled NREL power outage, to upgrade campus power capacity, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, TWC, EFM-100.
12BMSGlobal 501A07/31/201212:28:0008/01/201206:18:00A GFCI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W. GFCI trip is caused by water logged Eppley PSP ventilator.
13BMSGlobal 501A07/06/201219:35:0007/09/201210:18:00A GFCI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W.
14BMSGlobal 501A05/26/201206:15:0005/26/201207:12:00Due to a planned power outage for SRRL electrical work, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC.
15BMSGlobal 501A11/12/201111:59:0011/12/201113:26:00Due to an undervoltage followed by a power outage at 13:12, the following BMS instruments may be reading bogus or invalid data: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TWC.
16BMSGlobal 501A09/08/201105:56:0009/08/201109:19:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC.
17BMSGlobal 501A07/07/201116:45:0007/08/201112:46:00A GFI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W.
18BMS1898Global 501A06/20/201100:10:0006/21/201105:09:00A GFI on the North/Center BMS table was tripped due to thunderstorms. Data from the following Global UV instruments are bogus due to not having power during this time: 501A, CUVA1, CUVB1, MS-210W.
19BMSGlobal 501A06/14/201113:01:0006/14/201113:14:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
20BMSGlobal 501A05/25/201105:19:0005/26/201112:16:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
21BMSGlobal 501A05/17/201114:20:0005/17/201114:48:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
22BMSGlobal 501A05/07/201105:18:0005/07/201111:45:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
23BMSGlobal 501A04/15/201106:11:0004/15/201106:50:00Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100.
24BMSGlobal 501A07/04/201018:10:0007/06/201007:30:00Due to several tripped GFCI outlets at SRRL the following instruments were without power from July 4 @ 18:10 to July 6 @ 7:30 MST: Global CUVA1, CUVB1, MS210W, 501A and Direct CUVA2, CUVB2, PGS100. The readings are either zero or bogus and should not be used.
25BMSGlobal 501A12/09/200910:52:0012/09/200914:22:00Due to a power outage (and bad power) at NREL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, POM-01.