R# | Site | Serial Number | Measurement | Start Date | Start Time | End Date | End Time | Data Quality Statement |
26 | BMS | 953001 | Direct CUVB2 | 08/13/2012 | 00:00:00 | 08/15/2012 | 15:04:00 | There is a signal problem with the Direct CUVB2, which is causing the signal to be lower than it should be and a tad noisy. Signal is also negative at night. Channel was shorted on 8/15/2012 and the problem appeared to be between patch panel and data logger. However problem fixed itself before patch panel could be opened. |
27 | BMS | 953001 | Direct CUVB2 | 07/20/2012 | 00:00:00 | 07/23/2012 | 08:11:00 | There is a signal problem with the Direct CUVB2, which is causing the signal to be lower than it should be and a tad noisy. Signal is also negative at night. J-box connector was re-seated which seemed to fix the problem. |
28 | BMS | | Direct CUVB2 | 07/06/2012 | 19:35:00 | 07/09/2012 | 10:18:00 | A GFCI on the North tracker post was tripped due to thunderstorms. Data from the following instruments are bogus due to not having power during this time: CUVA2, CUVB2, TWC, PGS-100, POM-01. |
29 | BMS | | Direct CUVB2 | 05/26/2012 | 06:15:00 | 05/26/2012 | 07:12:00 | Due to a planned power outage for SRRL electrical work, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC. |
30 | BMS | 953001 | Direct CUVB2 | 01/03/2012 | 09:00:00 | 01/18/2012 | 09:09:00 | There is a signal problem with the Direct CUVB2, which is causing the signal to be lower than it should be and negative at night or overcast conditions. J-box connector was re-seated which seemed to fix the problem. |
31 | BMS | | Direct CUVB2 | 11/12/2011 | 11:59:00 | 11/12/2011 | 13:26:00 | Due to an undervoltage followed by a power outage at 13:12, the following BMS instruments may be reading bogus or invalid data: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TWC. |
32 | BMS | | Direct CUVB2 | 09/08/2011 | 05:56:00 | 09/08/2011 | 09:19:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, PGS-100, POM-01, TWC. |
33 | BMS | | Direct CUVB2 | 07/12/2011 | 22:57:00 | 07/13/2011 | 07:40:00 | Due to a tripped GFCI outlet at SRRL the following instruments were without power during this time: TWC & POM-01 Photometers, Direct CUVA2 & CUVB2, and the PGS100. The readings are either zero or bogus and should not be used. GFCI was tripped due to Eppley venitlators which were water logged by thunderstorm. |
34 | BMS | | Direct CUVB2 | 06/14/2011 | 13:01:00 | 06/14/2011 | 13:14:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
35 | BMS | | Direct CUVB2 | 05/25/2011 | 05:19:00 | 05/26/2011 | 12:16:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
36 | BMS | | Direct CUVB2 | 05/17/2011 | 14:20:00 | 05/17/2011 | 14:48:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
37 | BMS | | Direct CUVB2 | 05/07/2011 | 05:55:00 | 05/09/2011 | 07:58:00 | There was a planned power outage for SRRL construction activities that started at 5:18 MST. Unfortunately, the backup generator provided to SRRL was providing bad power to the UPS powering the Sci-Tec trackers, therefore the UPS failed at 5:55 MST. Unfortunately, when normal AC power was restored at 11:45 MST, the Sci-Tec trackers had lost all their configuration due to UPS cycling on and off during the outage, therefore were not tracking. The tracker settings were restored on May 9 at 7:58 MST. The following BMS instruments were not pointing at the sun during this time: Direct CH1, NIP #2, NIP #1, LI-201, NIP RG780, CUVA2, CUVB2, TWC; and the following instruments were un-shaded: Diffuse 8-48, PSP, CM22, CUV4, PIR, CG4 |
38 | BMS | | Direct CUVB2 | 05/07/2011 | 05:18:00 | 05/07/2011 | 11:45:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
39 | BMS | | Direct CUVB2 | 04/15/2011 | 06:11:00 | 04/15/2011 | 06:50:00 | Due to a planned power outage for SRRL construction activities, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210W, SPN1, TSI-880, PGS-100, POM-01, EFM-100. |
40 | BMS | | Direct CUVB2 | 07/04/2010 | 18:10:00 | 07/06/2010 | 07:30:00 | Due to several tripped GFCI outlets at SRRL the following instruments were without power from July 4 @ 18:10 to July 6 @ 7:30 MST: Global CUVA1, CUVB1, MS210W, 501A and Direct CUVA2, CUVB2, PGS100. The readings are either zero or bogus and should not be used. |
41 | BMS | 953001 | Direct CUVB2 | 06/11/2010 | 14:38:00 | 06/14/2010 | 08:01:00 | The Kipp & Zonen Direct CUVA2 and CUVB2 were without power during this time, most likely due to tripped GFI caused by hail storm. Measured signal is bogus. |
42 | BMS | | Direct CUVB2 | 05/27/2010 | 18:00:00 | 05/28/2010 | 12:15:00 | Due to improper mounting of the replacement CH1 s/n 080033 the Sci-tec tracker was not tracking properly due to collision with the CH1 against tracker. The following BMS instruments were not pointing at the sun: Direct CH1, NIP2, CUVA2, & CUVB2 and the following instruments were unshaded: 8-48, PSP, PIR. |
43 | BMS | | Direct CUVB2 | 12/09/2009 | 10:52:00 | 12/09/2009 | 14:22:00 | Due to a power outage (and bad power) at NREL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, POM-01. |
44 | BMS | | Direct CUVB2 | 11/15/2008 | 07:45:00 | 11/15/2008 | 14:29:00 | Due to a planned power outage at SRRL, the following BMS instruments were down: TSP-1, TSP-700, UVSAT, UVSBT, CUVA1, CUVA2, CUVB1, CUVB2, UVB-1, 501A, MS210, SPN1, Snow Depth, TSI-880, SkyCam. |
45 | BMS | 953001 | Direct CUVB2 | 05/25/2006 | 10:50:00 | 05/25/2006 | 11:26:00 | Sun Follower III tracker was down due to power shutdown for installation of new SRRL equipment lift. The following instruments were NOT pointing at the SUN: NIP #1, NIP RG780, CUVB2, LI-201, TWC (500nm). |
46 | BMS | 953001 | Direct CUVB2 | 11/05/2005 | 06:37:00 | 11/07/2005 | 08:10:00 | Sun Follower III tracker was down due to a power outage on 11/4/2005 at 23:14 MST. The following instruments were NOT pointing at the SUN: NIP #1, NIP RG780, CUVB2, LI-201. |
47 | BMS | 953001 | Direct CUVB2 | 07/23/2005 | 10:16:00 | 07/24/2005 | 09:01:00 | Sun Follower III tracker was down due to a scheduled NREL power outage on 7/23/2005 at 5:33 MST. The following instruments were NOT pointing at the SUN: NIP #1, NIP RG780, CUVB2, LI-201. |
48 | BMS | 953001 | Direct CUVB2 | 07/16/2005 | 00:00:00 | 07/18/2005 | 07:46:00 | The Sun Follower III tracker was hung up on cables, due to a research NIP removal that occured earlier in the week. This instrument was not pointing at the sun during this time. |